Prime Minister Shehbaz Sharif chaired a evaluation assembly on the efficiency of electrical energy distribution firms, together with Lahore Electrical Provide Firm (LESCO), Peshawar Electrical Provide Firm (PESCO), and Faisalabad Electrical Provide Firm (FESCO).
The assembly centered on addressing key points associated to overbilling, energy theft, and guaranteeing transparency in billing practices.
The Prime Minister directed that the set up of good meters be expedited to make sure accuracy and transparency within the billing system.
He emphasised that overbilling wouldn’t be tolerated and that strict motion can be taken towards officers concerned in such practices.
As well as, the Prime Minister referred to as for complete measures to curb electrical energy theft and guarantee environment friendly distribution.
He expressed concern over the gradual tempo of the appointment course of for Chief Government Officers (CEOs) of the ability distribution firms and instructed that the method be accomplished promptly by means of a clear and merit-based method.
Prime Minister Shehbaz Sharif additionally careworn the significance of advantage within the recruitment course of for workers throughout the electrical energy distribution firms, stating that no leniency can be allowed in guaranteeing transparency. He additionally urged the usage of all out there sources to fulfill targets set by the Nationwide Electrical Energy Regulatory Authority (NEPRA).
The assembly included an in depth briefing on the efficiency of LESCO, PESCO, and FESCO. As of November 2024, LESCO’s restoration charge stood at 96.82%, PESCO’s at 87.98%, and FESCO’s at 97.57%.
Federal Minister for Financial Affairs Ahsan Khan Cheema, Federal Minister for Energy Division Sardar Owais Ahmad Khan Leghari, State Minister for IT & Telecom Shaza Fatima, State Minister for Finance & Income Ali Pervez Malik, Prime Minister’s Coordinator Rana Ehsaas Afzal, and senior authorities officers participated within the assembly.